why ted kennedy doesn't want windmills near him:
Size
Pictures from the energy companies show slim towers rising cleanly from the landscape or hovering faintly in the distant haze, their presence modulated by soft clouds behind them. But a 200- to 300-foot tower supporting a turbine housing the size of a bus and three 100- to 150-foot rotor blades sweeping over an acre of air at more than 100 mph requires, for a start, a large and solid foundation. On a GE 1.5-MW tower, the turbine housing, or nacelle, weighs over 56 tons, the blade assembly weighs over 36 tons, and the whole tower assembly totals over 163 tons. [Click here for a perspective on their size. Click here for the specs of popular models.]
As FPL (Florida Power & Light) Energy says, "a typical turbine site takes about a 42×42-foot-square graveled area." Each tower (and a site needs at least 15-20 towers to make investment worthwhile) requires a huge hole filled with steel rebar–reinforced concrete (e.g., 1,250 tons in each foundation at the facility in Lamar, Colo.). According to Country Guardian, the hole is large enough to fit three double-decker buses. At the 89-turbine Top of Iowa facility, the foundation of each 323-foot assembly is a 7-feet-deep 42-feet-diameter octagon filled with 25,713 pounds of reinforced steel and 181 cubic yards of concrete. The foundations at the Wild Horse project in Washington are 30 feet deep. At Buffalo Mountain in Tennessee, too, each foundation is at least 30 feet deep and may contain more than 3,500 cubic yards of concrete (production of which is a major source of CO2). On Cefn Croes in Wales the developer built a complete concrete factory on the site, which is not unusual, as well as opened quarries to provide rock for new roads -- neither of which activities were part of the original planning application [click here for photos of the abhorrent destruction on Cefn Croes].
On many such mountain ridges as well as other locations, it would be necessary to blast into the bedrock, as Enxco's New England representative, John Zimmerman, has confirmed, possibly disrupting the water sources for wells downhill. At the Waymart plant in Pennsylvania, the foundations extend 30-40 feet into the bedrock. At Romney Marsh in southern England, foundation pillars will be sunk 110 feet. For each 6-feet-deep foundation at the Crescent Ridge facility in Illinois, another 24 feet was dug out and filled with sand. Construction at a site on the Slieve Aughty range in Ireland in October 2003 caused a 2.5-mile-long bog slide.
(Building on peat bogs is recognized as a serious disruption of an important carbon sink; the Royal Society for the Protection of Birds opposes wind development on the Scottish island of Lewis because the turbines would take 25 years to theoretically save the amount of carbon that their construction will release from the peat (not to mention the threat to birds -- see below).
Size
Pictures from the energy companies show slim towers rising cleanly from the landscape or hovering faintly in the distant haze, their presence modulated by soft clouds behind them. But a 200- to 300-foot tower supporting a turbine housing the size of a bus and three 100- to 150-foot rotor blades sweeping over an acre of air at more than 100 mph requires, for a start, a large and solid foundation. On a GE 1.5-MW tower, the turbine housing, or nacelle, weighs over 56 tons, the blade assembly weighs over 36 tons, and the whole tower assembly totals over 163 tons. [Click here for a perspective on their size. Click here for the specs of popular models.]
As FPL (Florida Power & Light) Energy says, "a typical turbine site takes about a 42×42-foot-square graveled area." Each tower (and a site needs at least 15-20 towers to make investment worthwhile) requires a huge hole filled with steel rebar–reinforced concrete (e.g., 1,250 tons in each foundation at the facility in Lamar, Colo.). According to Country Guardian, the hole is large enough to fit three double-decker buses. At the 89-turbine Top of Iowa facility, the foundation of each 323-foot assembly is a 7-feet-deep 42-feet-diameter octagon filled with 25,713 pounds of reinforced steel and 181 cubic yards of concrete. The foundations at the Wild Horse project in Washington are 30 feet deep. At Buffalo Mountain in Tennessee, too, each foundation is at least 30 feet deep and may contain more than 3,500 cubic yards of concrete (production of which is a major source of CO2). On Cefn Croes in Wales the developer built a complete concrete factory on the site, which is not unusual, as well as opened quarries to provide rock for new roads -- neither of which activities were part of the original planning application [click here for photos of the abhorrent destruction on Cefn Croes].
On many such mountain ridges as well as other locations, it would be necessary to blast into the bedrock, as Enxco's New England representative, John Zimmerman, has confirmed, possibly disrupting the water sources for wells downhill. At the Waymart plant in Pennsylvania, the foundations extend 30-40 feet into the bedrock. At Romney Marsh in southern England, foundation pillars will be sunk 110 feet. For each 6-feet-deep foundation at the Crescent Ridge facility in Illinois, another 24 feet was dug out and filled with sand. Construction at a site on the Slieve Aughty range in Ireland in October 2003 caused a 2.5-mile-long bog slide.
(Building on peat bogs is recognized as a serious disruption of an important carbon sink; the Royal Society for the Protection of Birds opposes wind development on the Scottish island of Lewis because the turbines would take 25 years to theoretically save the amount of carbon that their construction will release from the peat (not to mention the threat to birds -- see below).